CEQA Guidelines

The PCL Foundation has included the CEQA Statutes, Guidelines and case law on its website to provide resources for the public with the environmental review process. This information can be found in its original form at the CERES website: www.ceres.ca.gov.

CEQA GUIDELINES
California Code of Regulations, Title 14, Division 6, Chapter 3,

Article 7. EIR Process. (Sections 15080-15097)

-Section 15080. General.
-Section 15081. Decision to Prepare an EIR.
-Section 15081.5. EIRs Required by Statute.
-Section 15082. Notice of Preparation and Determination of Scope of EIR.
-Section 15083. Early Public Consultation.
-Section 15084. Preparing the Draft EIR.
-Section 15085. Notice of Completion.
-Section 15086. Consultation Concerning Draft EIR.
-Section 15087. Public Review of Draft EIR.
-Section 15088. Evaluation of and Response to Comments.
-Section 15088.5. Recirculation of an EIR Prior to Certification.
-Section 15089. Preparation of Final EIR.
-Section 15090. Certification of the Final EIR.
-Section 15091. Findings.
-Section 15092. Approval.
-Section 15093. Statement of Overriding Considerations.
-Section 15094. Notice of Determination.
-Section 15095. Disposition of a Final EIR.
-Section 15096. Process for a Responsible Agency.
-Section 15097. Mitigation Monitoring or Reporting.

Section 15080. General.
To the extent possible, the EIR process should be combined with the existing planning, review, and project approval process used by each public agency.
Back to the Top

Section 15081. Decision to Prepare an EIR.
The EIR process starts with the decision to prepare an EIR. This decision will be made either during preliminary review under Section 15060 or at the conclusion of an initial study after applying the standards described in Section 15064.
Back to the Top

Section 15081.5. EIRs Required by Statute.
(a) A lead agency shall prepare or have prepared an EIR for the following types of projects. An initial study may be prepared to help identify the significant effects of the project.

(1) The burning of municipal wastes, hazardous wastes, or refuse-derived fuel, including but not limited to tires, if the project is either:

(A) The construction of a new facility; or

(B) The expansion of an existing facility that burns hazardous waste that would increase its permitted capacity by more than 10 percent. This does not apply to any project exclusively burning hazardous waste for which a determination to prepare a negative declaration, or mitigated negative declaration or environmental impact report was made prior to July 14, 1989. The amount of expansion of an existing facility is calculated pursuant to subdivision (b) of Section 21151.1 of the Public Resources Code.

(C) Subdivision (1) of the subdivision does not apply to:

1. Projects for which the State Energy Resources Conservation and Development Commission has assumed jurisdiction pursuant to Chapter 6 (commencing with Section 25500) of Division 15 of the Public Resources Code.

2. Any of the types of burn or thermal processing projects listed in subdivision (d) of Section 21151.1 of the Public Resources Code.

(2) The initial issuance of a hazardous waste facilities permit to a land disposal facility, as defined in subdivision (d) of Section 25199.1 of the Health and Safety Code. Preparation of an EIR is not mandatory if the facility only manages hazardous waste which is identified or listed pursuant to Section 25140 or Section 25141 of the Health and Safety Code on or after January 1, 1992; or only conducts activities which are regulated pursuant to Chapter 6.5 (commencing with Section 25100) of Division 20 of the Health and Safety Code on or after January 1, 1992. "Initial issuance" does not include the issuance of a closure or postclosure permit pursuant to Chapter 6.5 (commencing with Section 25100) of Division 20 of the Health and Safety Code.

(3) The initial issuance of a hazardous waste facility permit pursuant to Section 25200 of the Health and Safety Code to an off-site large treatment facility, as defined pursuant to subdivision (d) of Section 25205.1 of that code. Preparation of an EIR is not mandatory if the facility only manges hazardous waste which is identified or listed pursuant to Section 25140 or Section 25141 of the Health and Safety Code on or after January 1, 1992; or only conducts activities which are regulated pursuant to Chapter 6.5 (commencing with Section 25100) of Division 20 of the Health and Safety Code on or after January 1, 1992. "Initial issuance" does not include the issuance of a closure or postclosure permit pursuant to Chapter 6.5 (commencing with Section 25100) of Division 20 of the Health and Safety Code.

(4) Any open pit mining operation which is subject to the permit requirements of the Surface Mining and Reclamation Act (beginning at Section 2710 of the Public Resources Code) and which utilizes a cyanide heap-leaching process for the purpose of extracting gold or other precious metals.

(5) An initial base reuse plan as defined in Section 15229.

(b) A lead agency shall prepare or have prepared an EIR for the selection of a California Community College, California State University, University of California, or California Maritime Academy campus location and approval of a long range development plan for that campus.

(1) The EIR for a long range development plan for a campus shall include an analysis of, among other significant impacts, those environmental effects relating to changes in enrollment levels.

(2) Subsequent projects within the campus may be addressed in environmental analyses tiered on the EIR prepared for the long range development plan.
Back to the Top

Section 15082. Notice of Preparation and Determination of Scope of EIR.
(a) Notice of Preparation. Immediately after deciding that an environmental impact report is required for a project, the lead agency shall send to the Office of Planning and Research and each responsible and trustee agency a notice of preparation stating that an environmental impact report will be prepared. This notice shall also be sent to every federal agency involved in approving or funding the project. If the United States Department of Defense or any branch of the United States Armed Forces has given the lead agency written notification of the specific boundaries of a low-level flight path, military impact zone, or special use airspace and provided the lead agency with written notification of the military contact office and address for the military service pursuant to subdivision (b) of Section 15190.5, then the lead agency shall include the specified military contact office in the list of organizations and individuals receiving a notice of preparation of an EIR pursuant to this section for projects that meet the criteria set forth in subdivision (c) of Section 15190.5.

(1) The notice of preparation shall provide the responsible and trustee agencies and the Office of Planning and Research with sufficient information describing the project and the potential environmental effects to enable the responsible agencies to make a meaningful response. At a minimum, the information shall include:

(A) Description of the project,

(B) Location of the project (either by street address and cross street, for a project in an urbanized area, or by attaching a specific map, preferably a copy of a U.S.G.S. 15'or 7 1/2'topographical map identified by quadrangle name), and

(C) Probable environmental effects of the project.

(2) A sample notice of preparation is shown in Appendix I. Public agencies are free to devise their own formats for this notice. A copy of the initial study may be sent with the notice to supply the necessary information.

(3) To send copies of the notice of preparation, the lead agency shall use either certified mail or any other method of transmittal that provides it with a record that the notice was received.

(4) The lead agency may begin work on the draft EIR immediately without awaiting responses to the notice of preparation. The draft EIR in preparation may need to be revised or expanded to conform to responses to the notice of preparation. A lead agency shall not circulate a draft EIR for public review before the time period for responses to the notice of preparation has expired.

(b) Response to Notice of Preparation. Within 30 days after receiving the notice of preparation under subdivision (a), each responsible and trustee agency and the Office of Planning and Research shall provide the lead agency with specific detail about the scope and content of the environmental information related to the responsible or trustee agency's area of statutory responsibility that must be included in the draft EIR.

(1) The response at a minimum shall identify:

(A) The significant environmental issues and reasonable alternatives and mitigation measures that the responsible or trustee agency, or the Office of Planning and Research will need to have explored in the draft EIR; and

(B) Whether the agency will be a responsible agency or trustee agency for the project.

(2) If a responsible or trustee agency, or the Office of Planning and Research fails by the end of the 30-day period to provide the lead agency with either a response to the notice or a well-justified request for additional time, the lead agency may presume that none of those entities have a response to make.

(3) A generalized list of concerns not related to the specific project shall not meet the requirements of this section for a response.

(c) Meetings. In order to expedite the consultation, the lead agency, a responsible agency, a trustee agency, the Office of Planning and Research, or a project applicant may request one or more meetings between representatives of the agencies involved to assist the lead agency in determining the scope and content of the environmental information that the responsible or trustee agency may require. Such meetings shall be convened by the lead agency as soon as possible, but no later than 30 days after the meetings were requested. On request, the Office of Planning and Research will assist in convening meetings that involve state agencies.

(1) For projects of statewide, regional or areawide significance pursuant to Section 15206, the lead agency shall conduct at least one scoping meeting. A scoping meeting held pursuant to the National Environmental Policy Act, 42 USC 4321 et seq. (NEPA) in the city or county within which the project is located satisfies this requirement if the lead agency meets the notice requirements of subsection (c)(2) below.

(2) The lead agency shall provide notice of the scoping meeting to all of the following:

(A) any county or city that borders on a county or city within which the project is located, unless otherwise designated annually by agreement between the lead agency and the county or city;

(B) any responsible agency

(C) any public agency that has jurisdiction by law with respect to the project;

(D) any organization or individual who has filed a written request for the notice.

(3) A lead agency shall call at least one scoping meeting for a proposed project that may affect highways or other facilities under the jurisdiction of the Department of Transportation if the meeting is requested by the department. The lead agency shall call the scoping meeting as soon as possible but not later than 30 days after receiving the request from the Department of Transportation.

(d) The Office of Planning and Research. The Office of Planning and Research will ensure that the state responsible and trustee agencies reply to the lead agency within 30 days of receipt of the notice of preparation by the state responsible and trustee agencies.

(e) Identification Number. When the notice of preparation is submitted to the State Clearinghouse, the state identification number issued by the Clearinghouse shall be the identification number for all subsequent environmental documents on the project. The identification number should be referenced on all subsequent correspondence regarding the project, specifically on the title page of the draft and final EIR and on the notice of determination.
Back to the Top

Section 15083. Early Public Consultation.
Prior to completing the draft EIR, the lead agency may also consult directly with any person or organization it believes will be concerned with the environmental effects of the project. Many public agencies have found that early consultation solves many potential problems that would arise in more serious forms later in the review process. This early consultation may be called scoping. Scoping will be necessary when preparing an EIR/EIS jointly with a federal agency.
(a) Scoping has been helpful to agencies in identifying the range of actions, alternatives, mitigation measures, and significant effects to be analyzed in depth in an EIR and in eliminating from detailed study issues found not to be important.

(b) Scoping has been found to be an effective way to bring together and resolve the concerns of affected federal, state, and local agencies, the proponent of the action, and other interested persons including those who might not be in accord with the action on environmental grounds.

(c) Where scoping is used, it should be combined to the extent possible with consultation under Section 15082.
Back to the Top

Section 15084. Preparing the Draft EIR.
(a) The draft EIR shall be prepared directly by or under contract to the lead agency. The required contents of a draft EIR are discussed in Article 9 beginning with Section 15120.

(b) The lead agency may require the project applicant to supply data and information both to determine whether the project may have a significant effect on the environment and to assist the lead agency in preparing the draft EIR. The requested information should include an identification of other public agencies which will have jurisdiction by law over the project.

(c) Any person, including the applicant, may submit information or comments to the lead agency to assist in the preparation of the draft EIR. The submittal may be presented in any format, including the form of a draft EIR. The lead agency must consider all information and comments received. The information or comments may be included in the draft EIR in whole or in part.

(d) The lead agency may choose one of the following arrangements or a combination of them for preparing a draft EIR.

(1) Preparing the draft EIR directly with its own staff.

(2) Contracting with another entity, public or private, to prepare the draft EIR.

(3) Accepting a draft prepared by the applicant, a consultant retained by the applicant, or any other person.

(4) Executing a third party contract or memorandum of understanding with the applicant to govern the preparation of a draft EIR by an independent contractor.

(5) Using a previously prepared EIR.

(e) Before using a draft prepared by another person, the lead agency shall subject the draft to the agency's own review and analysis. The draft EIR which is sent out for public review must reflect the independent judgment of the lead agency. The lead agency is responsible for the adequacy and objectivity of the draft EIR.
Back to the Top

Section 15085. Notice of Completion.
(a) As soon as the draft EIR is completed, a notice of completion must be filed with the Office of Planning and Research in a printed hard copy or in electronic form on a diskette or by electronic mail transmission.

(b) The notice of completion shall include:

(1) A brief description of the project,

(2) The proposed location of the project (either by street address and cross street, for a project in an urbanized area, or by attaching a specific map, preferably a copy of a U.S.G.S. 15'or 7-1/2'topographical map identified by quadrangle name).

(3) An address where copies of the draft EIR are available, and

(4) The review period during which comments will be received on the draft EIR.

(c) A sample form for the notice of completion is included in Appendix L.

(d) Where the EIR will be reviewed through the state review process handled by the State Clearinghouse, the notice of completion cover form required by the State Clearinghouse will serve as the notice of completion (see Appendix C).

(e) Public agencies are encouraged to make copies of notices of completion filed pursuant to this section available in electronic format on the Internet.
Back to the Top

Section 15086. Consultation Concerning Draft EIR.
(a) The lead agency shall consult with and request comments on the draft EIR from:

(1) Responsible agencies,

(2) Trustee agencies with resources affected by the project, and

(3) Any other state, federal, and local agencies which have jurisdiction by law with respect to the project or which exercise authority over resources which may be affected by the project, including water agencies consulted pursuant to section 15083.5.

(4) Any city or county which borders on a city or county within which the project is located.

(5) For a project of statewide, regional, or areawide significance, the transportation planning agencies and public agencies which have transportation facilities within their jurisdictions which could be affected by the project. "Transportation facilities" includes: major local arterials and public transit within five miles of the project site, and freeways, highways and rail transit service within 10 miles of the project site.

(6) For a state lead agency when the EIR is being prepared for a highway or freeway project, the State Air Resources Board as to the air pollution impact of the potential vehicular use of the highway or freeway and if a non-attainment area, the local air quality management district for a determination of conformity with the air quality management plan.

(7) For a subdivision project located within one mile of a facility of the State Water Resources Development System, the California Department of Water Resources.

(b) The lead agency may consult directly with:

(1) Any person who has special expertise with respect to any environmental impact involved,

(2) Any member of the public who has filed a written request for notice with the lead agency or the clerk of the governing body.

(3) Any person identified by the applicant whom the applicant believes will be concerned with the environmental effects of the project.

(c) A responsible agency or other public agency shall only make substantive comments regarding those activities involved in the project that are within an area of expertise of the agency or which are required to be carried out or approved by the responsible agency. Those comments shall be supported by specific documentation.

(d) Prior to the close of the public review period, a responsible agency or trustee agency which has identified what that agency considers to be significant environmental effects shall advise the lead agency of those effects. As to those effects relevant to its decision, if any, on the project, the responsible or trustee agency shall either submit to the lead agency complete and detailed performance objectives for mitigation measures addressing those effects or refer the lead agency to appropriate, readily available guidelines or reference documents concerning mitigation measures. If the responsible or trustee agency is not aware of mitigation measures that address identified effects, the responsible or trustee agency shall so state.
Back to the Top

Section 15087. Public Review of Draft EIR.
(a) The lead agency shall provide public notice of the availability of a draft EIR at the same time as it sends a notice of completion to the Office of Planning and Research. If the United States Department of Defense or any branch of the United States Armed Forces has given the lead agency written notification of the specific boundaries of a low-level flight path, military impact zone, or special use airspace and provided the lead agency with written notification of the contact office and address for the military service pursuant to subdivision (b) of Section 15190.5, then the lead agency shall include the specified military contact office in the list of organizations and individuals receiving a notice of availability of a draft EIR pursuant to this section for projects that meet the criteria set forth in subdivision (c) of Section 15190.5. The public notice shall be given as provided under Section 15105 (a sample form is provided in Appendix L). Notice shall be mailed to the last known name and address of all organizations and individuals who have previously requested such notice in writing, and shall also be given by at least one of the following procedures:

(1) Publication at least one time by the public agency in a newspaper of general circulation in the area affected by the proposed project. If more than one area is affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.

(2) Posting of notice by the public agency on and off the site in the area where the project is to be located.

(3) Direct mailing to the owners and occupants of property contiguous to the parcel or parcels on which the project is located. Owners of such property shall be identified as shown on the latest equalized assessment roll.

(b) The alternatives for providing notice specified in subdivision (a) shall not preclude a public agency from providing additional notice by other means if such agency so desires, nor shall the requirements of this section preclude a public agency from providing the public notice required by this section at the same time and in the same manner as public notice otherwise required by law for the project.

(c) The notice shall disclose the following:

(1) A brief description of the proposed project and its location.

(2) The starting and ending dates for the review period during which the lead agency will receive comments. If the review period is shortened, the notice shall disclose that fact.

(3) The date, time, and place of any scheduled public meetings or hearings to be held by the lead agency on the proposed project when known to the lead agency at the time of notice.

(4) A list of the significant environmental effects anticipated as a result of the project, to the extent which such effects are known to the lead agency at the time of the notice.

(5) The address where copies of the EIR and all documents referenced in the EIR will be available for public review. This location shall be readily accessible to the public during the lead agency's normal working hours.

(6) The presence of the site on any of the lists of sites enumerated under Section 65962.5 of the Government Code including, but not limited to lists of hazardous waste facilities, land designated as hazardous waste property, hazardous waste disposal sites and others, and the information in the Hazardous Waste and Substances Statement required under subdivision (f) of that Section.

(d) The notice required under this section shall be posted in the office of the county clerk of each county in which the project will be located for a period of at least 30 days. The county clerk shall post such notices within 24 hours of receipt.

(e) In order to provide sufficient time for public review, the review period for a draft EIR shall be as provided in Section 15105. The review period shall be combined with the consultation required under Section 15086. When a draft EIR has been submitted to the State Clearinghouse, the public review period shall be at least as long as the review period established by the State Clearinghouse. The public review period and the state agency review period may, but are not required to, begin and end at the same time. Day one of the state review period shall be the date that the State Clearinghouse distributes the document to state agencies.

(f) Public agencies shall use the State Clearinghouse to distribute draft EIRs to state agencies for review and should use areawide clearinghouses to distribute the documents to regional and local agencies.

(g) To make copies of EIRs available to the public, lead agencies should furnish copies of draft EIRs to public library systems serving the area involved. Copies should also be available in offices of the lead agency.

(h) Public agencies should compile listings of other agencies, particularly local agencies, which have jurisdiction by law and/or special expertise with respect to various projects and project locations. Such listings should be a guide in determining which agencies should be consulted with regard to a particular project.

(i) Public hearings may be conducted on the environmental documents, either in separate proceedings or in conjunction with other proceedings of the public agency. Public hearings are encouraged, but not required as an element of the CEQA process.
Back to the Top

Section 15088. Evaluation of and Response to Comments.
(a) The lead agency shall evaluate comments on environmental issues received from persons who reviewed the draft EIR and shall prepare a written response. The lead agency shall respond to comments received during the noticed comment period and any extensions and may respond to late comments.

(b) The lead agency shall provide a written proposed response to a public agency on comments made by that public agency at least 10 days prior to certifying an environmental impact report.

(c) The written response shall describe the disposition of significant environmental issues raised (e.g., revisions to the proposed project to mitigate anticipated impacts or objections). In particular, the major environmental issues raised when the lead agency's position is at variance with recommendations and objections raised in the comments must be addressed in detail giving reasons why specific comments and suggestions were not accepted. There must be good faith, reasoned analysis in response. Conclusory statements unsupported by factual information will not suffice.

(d) The response to comments may take the form of a revision to the draft EIR or may be a separate section in the final EIR. Where the response to comments makes important changes in the information contained in the text of the draft EIR, the lead agency should either:

(1) Revise the text in the body of the EIR, or

(2) Include marginal notes showing that the information is revised in the response to comments.
Back to the Top

Section 15088.5. Recirculation of an EIR Prior to Certification.
(a) A lead agency is required to recirculate an EIR when significant new information is added to the EIR after public notice is given of the availability of the draft EIR for public review under Section 15087 but before certification. As used in this section, the term "information" can include changes in the project or environmental setting as well as additional data or other information. New information added to an EIR is not "significant" unless the EIR is changed in a way that deprives the public of a meaningful opportunity to comment upon a substantial adverse environmental effect of the project or a feasible way to mitigate or avoid such an effect (including a feasible project alternative) that the project's proponents have declined to implement. "Significant new information" requiring recirculation include, for example, a disclosure showing that:

(1) A new significant environmental impact would result from the project or from a new mitigation measure proposed to be implemented.

(2) A substantial increase in the severity of an environmental impact would result unless mitigation measures are adopted that reduce the impact to a level of insignificance.

(3) A feasible project alternative or mitigation measure considerably different from others previously analyzed would clearly lessen the significant environmental impacts of the project, but the project's proponents decline to adopt it.

(4) The draft EIR was so fundamentally and basically inadequate and conclusory in nature that meaningful public review and comment were precluded. (Mountain Lion Coalition v. Fish & Game Com.(1989) 214 Cal.App.3d 1043).

(b) Recirculation is not required where the new information added to the EIR merely clarifies or amplifies or makes insignificant modifications in an adequate EIR.

(c) If the revision is limited to a few chapters or portions of the EIR, the lead agency need only recirculate the chapters or portions that have been modified.

(d) Recirculation of an EIR requires notice pursuant to Section 15087, and consultation pursuant to Section 15086.

(e) A decision not to recirculate an EIR must be supported by substantial evidence in the administrative record.

(f) The lead agency shall evaluate and respond to comments as provided in Section 15088. Recirculating an EIR can result in the lead agency receiving more than one set of comments from reviewers. The following are two ways in which the lead agency may identify the set of comments to which it will respond. This dual approach avoids confusion over whether the lead agency must respond to comments which are duplicates or which are no longer pertinent due to revisions to the EIR. In no case shall the lead agency fail to respond to pertinent comments on significant environmental issues.

(1) When an EIR is substantially revised and the entire document is recirculated, the lead agency may require reviewers to submit new comments and, in such cases, need not respond to those comments received during the earlier circulation period. The lead agency shall advise reviewers, either in the text of the revised EIR or by an attachment to the revised EIR, that although part of the administrative record, the previous comments do not require a written response in the final EIR, and that new comments must be submitted for the revised EIR. The lead agency need only respond to those comments submitted in response to the recirculated revised EIR.

(2) When the EIR is revised only in part and the lead agency is recirculating only the revised chapters or portions of the EIR, the lead agency may request that reviewers limit their comments to the revised chapters or portions of the recirculated EIR. The lead agency need only respond to (i) comments received during the initial circulation period that relate to chapters or portions of the document that were not revised and recirculated, and (ii) comments received during the recirculation period that relate to the chapters or portions of the earlier EIR that were revised and recirculated. The lead agency's request that reviewers limit the scope of their comments shall be included either within the text of the revised EIR or by an attachment to the revised EIR.

(3) As part of providing notice of recirculation as required by Public Resources Code Section 21092.1, the lead agency shall send a notice of recirculation to every agency, person, or organization that commented on the prior EIR. The notice shall indicate, at a minimum, whether new comments may be submitted only on the recirculated portions of the EIR or on the entire EIR in order to be considered by the agency.

(g) When recirculating a revised EIR, either in whole or in part, the lead agency shall, in the revised EIR or by an attachment to the revised EIR, summarize the revisions made to the previously circulated draft EIR.
Back to the Top

Section 15089. Preparation of Final EIR.
(a) The lead agency shall prepare a final EIR before approving the project. The contents of a final EIR are specified in Section 15132 of these guidelines.

(b) Lead agencies may provide an opportunity for review of the final EIR by the public or by commenting agencies before approving the project. The review of a final EIR should focus on the responses to comments on the draft EIR.
Back to the Top

Section 15090. Certification of the Final EIR.
(a) Prior to approving a project the lead agency shall certify that:

(1) The final EIR has been completed in compliance with CEQA;

(2) The final EIR was presented to the decisionmaking body of the lead agency and that the decisionmaking body reviewed and considered the information contained in the final EIR prior to approving the project; and

(3) The final EIR reflects the lead agency's independent judgment and analysis.

(b) When an EIR is certified by a non-elected decision-making body within a local lead agency, that certification may be appealed to the local lead agency's elected decision-making body, if one exists. For example, certification of an EIR for a tentative subdivision map by a city's planning commission may be appealed to the city council. Each local lead agency shall provide for such appeals.
Back to the Top

Section 15091. Findings.
(a) No public agency shall approve or carry out a project for which an EIR has been certified which identifies one or more significant environmental effects of the project unless the public agency makes one or more written findings for each of those significant effects, accompanied by a brief explanation of the rationale for each finding. The possible findings are:

(1) Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the final EIR.

(2) Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by such other agency.

(3) Specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the final EIR.

(b) The findings required by subdivision (a) shall be supported by substantial evidence in the record.

(c) The finding in subdivision (a)(2) shall not be made if the agency making the finding has concurrent jurisdiction with another agency to deal with identified feasible mitigation measures or alternatives. The finding in subdivision (a)(3) shall describe the specific reasons for rejecting identified mitigation measures and project alternatives.

(d) When making the findings required in subdivision (a)(1), the agency shall also adopt a program for reporting on or monitoring the changes which it has either required in the project or made a condition of approval to avoid or substantially lessen significant environmental effects. These measures must be fully enforceable through permit conditions, agreements, or other measures.

(e) The public agency shall specify the location and custodian of the documents or other material which constitute the record of the proceedings upon which its decision is based.

(f) A statement made pursuant to Section 15093 does not substitute for the findings required by this section.
Back to the Top

Section 15092. Approval.
(a) After considering the final EIR and in conjunction with making findings under Section 15091, the lead agency may decide whether or how to approve or carry out the project.

(b) A public agency shall not decide to approve or carry out a project for which an EIR was prepared unless either:

(1) The project as approved will not have a significant effect on the environment, or

(2) The agency has:

(A) Eliminated or substantially lessened all significant effects on the environment where feasible as shown in findings under Section 15091, and

(B) Determined that any remaining significant effects on the environment found to be unavoidable under Section 15091 are acceptable due to overriding concerns as described in Section 15093.

(c) With respect to a project which includes housing development, the public agency shall not reduce the proposed number of housing units as a mitigation measure if it determines that there is another feasible specific mitigation measure available that will provide a comparable level of mitigation.
Back to the Top

Section 15093. Statement of Overriding Considerations.
(a) CEQA requires the decision-making agency to balance, as applicable, the economic, legal, social, technological, or other benefits of a proposed project against its unavoidable environmental risks when determining whether to approve the project. If the specific economic, legal, social, technological, or other benefits of a proposal project outweigh the unavoidable adverse environmental effects, the adverse environmental effects may be considered "acceptable."

(b) When the lead agency approves a project which will result in the occurrence of significant effects which are identified in the final EIR but are not avoided or substantially lessened, the agency shall state in writing the specific reasons to support its action based on the final EIR and/or other information in the record. The statement of overriding considerations shall be supported by substantial evidence in the record.

(c) If an agency makes a statement of overriding considerations, the statement should be included in the record of the project approval and should be mentioned in the notice of determination. This statement does not substitute for, and shall be in addition to, findings required pursuant to Section 15091.
Back to the Top

Section 15094. Notice of Determination.
(a) The lead agency shall file a notice of determination within five working days after deciding to carry out or approve the project.

(b) The notice of determination shall include:

(1) An identification of the project including the project title as identified on the draft EIR, and the location of the project (either by street address and cross street for a project in an urbanized area or by attaching a specific map, preferably a copy of a U.S.G.S. 15'or 7-1/2'topographical map identified by quadrangle name). If the notice of determination is filed with the State Clearinghouse, the State Clearinghouse identification number for the draft EIR shall be provided.

(2) A brief description of the project.

(3) The lead agency's name and the date on which the agency approved the project. If a responsible agency files the notice of determination pursuant to Section 15096(i), the responsible agency's name and date of approval shall also be identified.

(4) The determination of the agency whether the project in its approved form will have a significant effect on the environment.

(5) A statement that an EIR was prepared and certified pursuant to the provisions of CEQA.

(6) Whether mitigation measures were made a condition of the approval of the project, and whether a mitigation monitoring plan/program was adopted.

(7) Whether findings were made pursuant to Section 15091.

(8) Whether a statement of overriding considerations was adopted for the project.

(9) The address where a copy of the final EIR and the record of project approval may be examined.

(c) If the lead agency is a state agency, the lead agency shall file the notice of determination with the Office of Planning and Research within five working days after approval of the project by the lead agency.

(d) If the lead agency is a local agency, the local lead agency shall file the notice of determination with the county clerk of the county or counties in which the project will be located, within five working days after approval of the project by the lead agency. If the project requires discretionary approval from any state agency, the local lead agency shall also, within five working days of this approval, file a copy of the notice of determination with the Office of Planning and Research.

(e) A notice of determination filed with the county clerk shall be available for public inspection and shall be posted within 24 hours of receipt for a period of at least 30 days. Thereafter, the clerk shall return the notice to the local lead agency with a notation of the period during which it was posted. The local lead agency shall retain the notice for not less than 12 months.

(f) A notice of determination filed with the Office of Planning and Research shall be available for public inspection and shall be posted for a period of at least 30 days. The Office of Planning and Research shall retain each notice for not less than 12 months.

(g) The filing of the notice of determination pursuant to subdivision (c) above for state agencies and the filing and posting of the notice of determination pursuant to subdivisions (d) and (e) above for local agencies, start a 30-day statute of limitations on court challenges to the approval under CEQA.

(h) A sample notice of determination is provided in Appendix D. Each public agency may devise its own form, but any such form shall include, at a minimum, the information required by subdivision (b). Public agencies are encouraged to make copies of all notices filed pursuant to this section available in electronic format on the Internet. Such electronic notices are in addition to the posting requirements of the Guidelines and the Public Resources Code.
Back to the Top

Section 15095. Disposition of a Final EIR.
The lead agency shall:
(a) File a copy of the final EIR with the appropriate planning agency of any city, county, or city and county where significant effects on the environment may occur.

(b) Include the final EIR as part of the regular project report which is used in the existing project review and budgetary process if such a report is used.

(c) Retain one or more copies of the final EIR as public records for a reasonable period of time.

(d) Require the applicant to provide a copy of the certified, final EIR to each responsible agency.
Back to the Top

Section 15096. Process for a Responsible Agency.
(a) General. A responsible agency complies with CEQA by considering the EIR or negative declaration prepared by the lead agency and by reaching its own conclusions on whether and how to approve the project involved. This section identifies the special duties a public agency will have when acting as a responsible agency.

(b) Response to Consultation. A responsible agency shall respond to consultation by the lead agency in order to assist the lead agency in preparing adequate environmental documents for the project. By this means, the responsible agency will ensure that the documents it will use will comply with CEQA.

(1) In response to consultation, a responsible agency shall explain its reasons for recommending whether the lead agency should prepare an EIR or negative declaration for a project. Where the responsible agency disagrees with the lead agency's proposal to prepare a negative declaration for a project, the responsible agency should identify the significant environmental effects which it believes could result from the project and recommend either that an EIR be prepared or that the project be modified to eliminate the significant effects.

(2) As soon as possible, but not longer than 30 days after receiving a notice of preparation from the lead agency, the responsible agency shall send a written reply by certified mail or any other method which provides the agency with a record showing that the notice was received. The reply shall specify the scope and content of the environmental information which would be germane to the responsible agency's statutory responsibilities in connection with the proposed project. The lead agency shall include this information in the EIR.

(c) Meetings. The responsible agency shall designate employees or representatives to attend meetings requested by the lead agency to discuss the scope and content of the EIR.

(d) Comments on Draft EIRs and Negative Declarations. A responsible agency should review and comment on draft EIRs and negative declarations for projects which the responsible agency would later be asked to approve. Comments should focus on any shortcomings in the EIR, the appropriateness of using a negative declaration, or on additional alternatives or mitigation measures which the EIR should include. The comments shall be limited to those project activities which are within the agency's area of expertise or which are required to be carried out or approved by the agency or which will be subject to the exercise of powers by the agency. Comments shall be as specific as possible and supported by either oral or written documentation.

(e) Decision on Adequacy of EIR or Negative Declaration. If a responsible agency believes that the final EIR or negative declaration prepared by the lead agency is not adequate for use by the responsible agency, the responsible agency must either:

(1) Take the issue to court within 30 days after the lead agency files a notice of determination;

(2) Be deemed to have waived any objection to the adequacy of the EIR or negative declaration;

(3) Prepare a subsequent EIR if permissible under Section 15162; or

(4) Assume the lead agency role as provided in Section 15052(a)(3).

(f) Consider the EIR or Negative Declaration. Prior to reaching a decision on the project, the responsible agency must consider the environmental effects of the project as shown in the EIR or negative declaration. A subsequent or supplemental EIR can be prepared only as provided in Sections 15162 or 15163.

(g) Adoption of Alternatives or Mitigation Measures.

(1) When considering alternatives and mitigation measures, a responsible agency is more limited than a lead agency. A responsible agency has responsibility for mitigating or avoiding only the direct or indirect environmental effects of those parts of the project which it decides to carry out, finance, or approve.

(2) When an EIR has been prepared for a project, the Responsible Agency shall not approve the project as proposed if the agency finds any feasible alternative or feasible mitigation measures within its powers that would substantially lessen or avoid any significant effect the project would have on the environment. With respect to a project which includes housing development, the responsible agency shall not reduce the proposed number of housing units as a mitigation measure if it determines that there is another feasible specific mitigation measure available that will provide a comparable level of mitigation.

(h) Findings. The responsible agency shall make the findings required by Section 15091 for each significant effect of the project and shall make the findings in Section 15093 if necessary.

(i) Notice of Determination. The responsible agency should file a notice of determination in the same manner as a lead agency under Section 15075 or 15094 except that the responsible agency does not need to state that the EIR or negative declaration complies with CEQA. The responsible agency should state that it considered the EIR or negative declaration as prepared by a lead agency.
Back to the Top

Section 15097. Mitigation Monitoring or Reporting.
(a) This section applies when a public agency has made the findings required under paragraph (1) of subdivision (a) of Section 15091 relative to an EIR or adopted a mitigated negative declaration in conjunction with approving a project. In order to ensure that the mitigation measures and project revisions identified in the EIR or negative declaration are implemented, the public agency shall adopt a program for monitoring or reporting on the revisions which it has required in the project and the measures it has imposed to mitigate or avoid significant environmental effects. A public agency may delegate reporting or monitoring responsibilities to another public agency or to a private entity which accepts the delegation; however, until mitigation measures have been completed the lead agency remains responsible for ensuring that implementation of the mitigation measures occurs in accordance with the program.

(b) Where the project at issue is the adoption of a general plan, specific plan, community plan or other plan-level document (zoning, ordinance, regulation, policy), the monitoring plan shall apply to policies and any other portion of the plan that is a mitigation measure or adopted alternative. The monitoring plan may consist of policies included in plan-level documents. The annual report on general plan status required pursuant to the Government Code is one example of a reporting program for adoption of a city or county general plan.

(c) The public agency may choose whether its program will monitor mitigation, report on mitigation, or both. "Reporting" generally consists of a written compliance review that is presented to the decision making body or authorized staff person. A report may be required at various stages during project implementation or upon completion of the mitigation measure. "Monitoring" is generally an ongoing or periodic process of project oversight. There is often no clear distinction between monitoring and reporting and the program best suited to ensuring compliance in any given instance will usually involve elements of both. The choice of program may be guided by the following:

(1) Reporting is suited to projects which have readily measurable or quantitative mitigation measures or which already involve regular review. For example, a report may be required upon issuance of final occupancy to a project whose mitigation measures were confirmed by building inspection.

(2) Monitoring is suited to projects with complex mitigation measures, such as wetlands restoration or archeological protection, which may exceed the expertise of the local agency to oversee, are expected to be implemented over a period of time, or require careful implementation to assure compliance.

(3) Reporting and monitoring are suited to all but the most simple projects. Monitoring ensures that project compliance is checked on a regular basis during and, if necessary after, implementation. Reporting ensures that the approving agency is informed of compliance with mitigation requirements.

(d) Lead and responsible agencies should coordinate their mitigation monitoring or reporting programs where possible. Generally, lead and responsible agencies for a given project will adopt separate and different monitoring or reporting programs. This occurs because of any of the following reasons: the agencies have adopted and are responsible for reporting on or monitoring different mitigation measures; the agencies are deciding on the project at different times; each agency has the discretion to choose its own approach to monitoring or reporting; and each agency has its own special expertise.

(e) At its discretion, an agency may adopt standardized policies and requirements to guide individually adopted monitoring or reporting programs. Standardized policies and requirements may describe, but are not limited to:

(1) The relative responsibilities of various departments within the agency for various aspects of monitoring or reporting, including lead responsibility for administering typical programs and support responsibilities.

(2) The responsibilities of the project proponent.

(3) Agency guidelines for preparing monitoring or reporting programs.

(4) General standards for determining project compliance with the mitigation measures or revisions and related conditions of approval.

(5) Enforcement procedures for noncompliance, including provisions for administrative appeal.

(6) Process for informing staff and decision makers of the relative success of mitigation measures and using those results to improve future mitigation measures.

(f) Where a trustee agency, in timely commenting upon a draft EIR or a proposed mitigated negative declaration, proposes mitigation measures or project revisions for incorporation into a project, that agency, at the same time, shall prepare and submit to the lead or responsible agency a draft monitoring or reporting program for those measures or revisions. The lead or responsible agency may use this information in preparing its monitoring or reporting program.

(g) When a project is of statewide, regional, or areawide importance, any transportation information generated by a required monitoring or reporting program shall be submitted to the transportation planning agency in the region where the project is located and to the California Department of Transportation. Each transportation planning agency and the California Department of Transportation shall adopt guidelines for the submittal of such information.
Back to the Top

 

 

[Return to CEQA Guidelines]

Publications Store

Publications Order Form
Online Resources
  CEQA Resources
    Get Familiar with CEQA
    Public Participation in CEQA
    CEQA Statutes, Guidelines, & Case Law
    Climate Change & CEQA
    CEQA Workshops
  Local Climate Action Initiative
  8 Affordable Water Solutions for California
  Sierra Nevada Grassroots Directory

1107 9th Street, Suite 360, Sacramento, CA 95814 • phone (916) 444-8726 • fax (916) 448-1789 •
Copyright • 2006 The PCL Foundation. All rights reserved. Privacy and Contribution Policies
To report problems with or to ask questions about our website, please email pclmail@pcl.org.